Motorists are advised of changed traffic conditions on the Olympic Highway at Cootamundra.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Work will recommence on the Gap Bridge project next week, involving replacement of culverts.
There will be a total road closures next Thursday, January 30 January, and on February 11 and 19.
These closures are required to enable the works to proceed unhindered on those days and allow the full culvert to be replaced under the road.
Traffic will be detoured via Dirnaseer Road and Suttons Lane.
The Gap Bridge project, three kilometres south of Cootamundra, will improve safety and reduce future maintenance costs.
Traffic control and reduced speed limits will be in place for the safety of workers and motorists.
Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.